Do the same at the unloading site: Build module and station, assign product to the module (1), and set it to <b>{0}</b> mode (2). A small arrow on each module shows the products flow direction.
trains tutorial, {0} = unloading mode name, the (1) and (2) are references to attached image
Sign in to submit translations and participate in voting
Sign in to participate in translation activities
OR