v1.0.0 | 2026-05-03
* Buildings tab — adjust boost % per machine, office, ore sorter, waste plant and more
* Belts & Pipes tab — adjust boost % per transport segment
* Mass Boost tab — apply a single % to all unlocked belts/pipes with a lock system
* Mass Select tab — reset selected buildings / belts / pipes to 100%
* Per-building Boost % control (100-500)
* Per-building Comments (auto-saved, searchable, sortable)
* Building Rename from the manager
* Camera Jump to any boosted building
* Sorting by %, name, or comments
* Copy Boost — boost settings transfer when copy-pasting buildings
* Ore Sorter Boost with power & worker scaling (plus tiered unsorted→sorted buff)
* Office Boost — extra workers/power/compute/supply in exchange for more Focus points
* Waste Sorting Boost — extra throughput at a steep power/maintenance cost
