Waste-N-Eater

Description

The Waste-N-Eater is designed to remove all waste from upto 11,500 people Living in T3 Housing. It will remove and process all Waste Water. As well as Biomass, and also Trash from the town. It provides its own Chlorine, as well as making enough clean water to provide to the town.The build needs some clean water to kick start the system delivered into both clean water tanks, also it requires 3 Coal, and 36 Rock per month along with 2 Sea water pipes, and one dump pipe for brine. It also provides a extra 140 clean water per month surplus Blueprint explanation video can be found on YouTube https://youtu.be/dd-phsAdCfk

Blueprint Version 1.1 Made in COI version 0.5.5 ~JDPlays

No comments yet